| 文件类型: |
doc |
 |
| 界面语言: |
简体中文 |
| 运行环境: |
NT/2000/XP/2003/Vista |
| 授权方式: |
[db:授权形式] |
| 软件大小: |
17.00KB |
| 软件等级: |
 |
| 资料类型: |
[db:软件类型] |
| 软件登陆: |
jian |
| 作 者 : |
|
| 解压密码: |
|
| 点数: |
4点 |
| 点数说明: |
下载点数获取方式:(1)通过充值获取点数在线充值 (2)通过每天签到获取点数,每天赠送的点数随机签到(3)通过共享资料,别人下载有收益分成发布 |
| 下载地址: |
[ 权限:普通会员 下载地址1 ]
|
| 软件简介: |
内容简介[关键词] 工程索赔;工程量清单;工程合同;材料差价 <br> The Principles of Construction Claim in The Era of Bill of Quantity <br> LI Guang-jun <br> Abstract:This paper has discussed the cause and basic principles of the construction claim, and the calculational methods for price difference claim of material. Quota costing system in the planned economic system adopt "cost + reward" contract and real settlement systems. The tender system by the bill of quantity in the market economic system adopts the unit price contract and the construction claim system. There is difference of principle between the two. Perfecting the system of construction claim has important realistic meanings in reducing the dispute of construction cost and controlling effectively construction cost. <br> Keywords:Bill of quantity;Construction contract;Construction Claim;Price difference of material <br> <br><br>
<BR />
|
| 下载帮助: |
发表评论 加入收藏夹 错误报告 |
|
版权声明
本文仅代表作者观点,不代表本站立场。
本文有所侵权,违规,请发送链接至 tmgczl@163.com一个工作日内处理完毕
本文地址:http://www.tmgczl.com/gongchengzaojia/zaojiaziliao/2019-04-11/37954.html